How Much Does Condo Renovation Cost in Malaysia?

Studio Room
Studio Room

There’s no single price that fits every condo. Cost depends on unit size and condition, scope of work, materials, carpentry level and building rules.

As a starting reference, SQFT Hub’s current Ready-to-Stay package prices for new condo units are:

These are current package examples, not a market-wide price. If your needs fall outside the package scope, a custom quotation is the safer way to plan.


Fixed Package vs Custom Renovation: Which Fits You?

A fixed package works well if you: Have a standard unit type, want a clear starting price, are comfortable with a curated scope, and prioritize a practical move-in or rental-ready setup over custom design.
 
Go custom if you: Need demolition/repairs, custom carpentry or a different layout, extra electrical/plumbing/aircon work, specific materials or built-ins, or your building has special renovation requirements.
 
Compare scope, not just price. Always ask for a written list of inclusions, exclusions and optional upgrades


What Affects Condo Renovation Cost?


Unit Size & Layout

Bigger units need more material and labor, but a compact unit with heavy carpentry or a custom kitchen can cost more than a larger unit with simple furnishing.

New Unit vs Existing/Resale

A new unit may only need furnishing and finishing touches. A resale unit often needs removal, repair or electrical work first, so don’t assume two same-sized units cost the same.

Carpentry, Finishes & Customisation

Cabinets, wardrobes, feature walls and built-ins are often the biggest cost driver. Custom sizing and premium finishes cost more than standardised package items.

Electrical, Lighting, Aircon & Other Works

Extra power points, rewiring, aircon and water points can change the scope. Confirm what’s included, optional or excluded before comparing quotes.

Condo Management / JMB / MC Requirements

Most Malaysian condos require renovation approval, with rules on access, hours, deposits, lift booking and debris disposal. These vary by building, so check with your JMB/MC first, and get any SQFT Hub coordination written into the quotation.



Costs Owners Often Forget to Ask About

Before signing, confirm whether these are included or charged separately:

  • Building management deposit/fees, lift booking or access charges
  • Common-area protection, cleaning, and debris disposal
  • Extra electrical/aircon work
  • Repairs to existing defects
  • Upgrades beyond the standard package spec
  • Appliances, specialist items, and non-standard delivery charges
  • Variation orders requested after scope is confirmed

Not every project hits all of these. The goal is knowing what’s inside the price before work starts.


Tips

How to Build a Renovation Budget Without Overcommitting

  • Decide the purpose. Own stay, rental, short-stay, or resale upgrade changes what’s worth spending on.
  • Separate must-haves from optional upgrades so essentials get funded first.
  • Choose package vs. custom early. Use a standard package as your starting point if it fits; request a custom quote if it clearly won’t.
  • Check building rules before scheduling. Approvals, deposits and access restrictions affect the budget and timeline.
  • Keep a buffer for material changes, added carpentry, or defects found on site.

Condo Renovation Cost FAQs

It varies by unit. SQFT Hub’s current Ready-to-Stay prices are RM15,000 (Studio), RM19,000 (1BR), RM25,000 (2BR) and RM30,000 (3BR). Custom renovations vary by size, condition, scope and materials.

No. Package prices apply to the defined Ready-to-Stay scope. If your unit needs repairs, demolition or work outside the package, request a custom quotation.

Yes, per the current Ready-to-Stay page. Confirm the exact item list, appliances and exclusions in your written quotation.

Often, yes, for clearer starting costs and a practical furnishing scope. The right fit depends on tenant profile and whether work is needed beyond the standard package.

Most buildings require JMB/MC approval, often with deposits, working-hour rules, lift booking and hacking restrictions. Rules vary by development, so check with your building first.

Scope of work, existing unit condition, custom carpentry, kitchen/wet-area work, electrical/aircon changes, materials, furnishing needs, and building constraints.

Yes, through SQFT Hub’s custom-request route. Confirm which items can change and how that affects pricing before ordering.

Send your unit type, location, floor plan, photos (if available), intended use, target move-in date and budget range for a tailored recommendation.

why choose us?

Homeowners Trust SQft Hub

Smart, practical, and hassle-free home setup solutions designed to help you move in faster with better budget control..

If our Ready to Stay Solutions do not match your requirements, you may request a customise home setup package with your budget.

WhatsApp Us for Custom Request